The course will start with Multi-Phase Flow and NODAL Analysis and how to compare and select the correct artificial lift system. A thorough understanding on the principles, applications, design and operational issues on the artificial lift system will be provided. The candidates will also learn how to analyze the cost when selecting the artificial lift system. Furthermore, the course will cover the advanced artificial lift systems currently available. They will gain knowledge on the advantages and disadvantages of each type of the advanced artificial lift system.
By the end of this BTS training course, participants will be able to:
Production Engineers, Field Operations Engineers, Production Technologists, Production Coordinators, Production Supervisors, Junior and Senior Petroleum Engineers, Senior Operators, Field Technicians; Geoscientists, Reservoir Engineers who wish to understand the implications of production systems on their field reservoirs.
This interactive Training will be highly interactive, with opportunities to advance your opinions and ideas and will include;
Day 1: Introduction to Artificial Lift Systems
• Overview of artificial lift methods and applications
• Importance of artificial lift in oil and gas production
• Types of artificial lift systems: ESP, PCP, Gas Lift, Rod Pump, etc.
• Selection criteria for artificial lift methods
Day 2: Electrical Submersible Pump (ESP) Systems
• Components and operation of ESP systems
• ESP installation, commissioning, and maintenance
• Performance monitoring and optimization
• Troubleshooting common ESP issues
Day 3: Progressive Cavity Pump (PCP) Systems
• Working principle and components of PCP systems
• Installation and operation of PCP
• Maintenance practices and troubleshooting
• Performance monitoring and efficiency optimization
Day 4: Gas Lift Systems
• Fundamentals of gas lift principles and operation
• Components of gas lift systems (valves, tubing, compressors)
• Gas lift design and optimization
• Troubleshooting gas lift issues
Day 5: Rod Pump Systems and System Integration
• Overview of sucker rod pumps and their operation
• Rod pump design, installation, and maintenance
• Integration of multiple artificial lift systems
• Case studies and hands-on troubleshooting exercises
BTS attendance certificate will be issued to all attendees completing minimum of 80% of the total course duration.
| Code | Date | Venue | Fees | Register |
|---|---|---|---|---|
| DE149-05 | 14-12-2025 | Dubai | USD 5450 | |
| DE149-01 | 06-04-2026 | Istanbul | USD 5950 | |
| DE149-02 | 05-07-2026 | Dubai | USD 5450 | |
| DE149-03 | 04-10-2026 | Doha | USD 5450 | |
| DE149-04 | 27-12-2026 | Dubai | USD 5450 |
With ESP becoming the artificial lift system of choice in many fields around the world, understanding how they work and how to correctly size and select them is of primary necessity to production engi ...
Providing services with a high quality that are satisfying the requirements
Appling the specifications and legalizations to ensure the quality of service.
Best utilization of resources for continually improving the business activities.
BTS keen to selects highly technical instructors based on professional field experience
Since BTS was established, it considered a training partner for world class oil & gas institution
1st floor, Incubator Buildingو Masdar City, Abu Dhabi, UAE
Sun to Fri 09:00 AM to 06:00 PM
Contact Us anytime!
Request Info