
Code | Date | Venue | Fees | Register |
---|---|---|---|---|
GE100-02 | 05-05-2025 | Kuala-Lumpur | USD 10710 | |
GE100-03 | 10-08-2025 | Dubai | USD 9810 | |
GE100-04 | 09-11-2025 | Manama | USD 9810 |
Cased-hole logging involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well during completion operations. Cased-hole logging is performed mo ...
No amount of fancy post-processing can really overcome problems caused by data which is bad from the start. Callibration and other wireline and MWD product quality problems discovered at the wellsite ...
This introductory course is designed for industry professionals with no prior geological training. Registrants will gain an understanding of fundamental geological principles and the tools and techniq ...
The course illustrates that production logging PLT refers to a suite of logs that are normally run on completed injection or production wells to evaluate the performance of the well itself or of the r ...
Cased-hole logging involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well during completion operations. Cased-hole logging is performed mo ...
No amount of fancy post-processing can really overcome problems caused by data which is bad from the start. Callibration and other wireline and MWD product quality problems discovered at the wellsite ...
This introductory course is designed for industry professionals with no prior geological training. Registrants will gain an understanding of fundamental geological principles and the tools and techniq ...
The course illustrates that production logging PLT refers to a suite of logs that are normally run on completed injection or production wells to evaluate the performance of the well itself or of the r ...
Cased-hole logging involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well during completion operations. Cased-hole logging is performed mo ...
No amount of fancy post-processing can really overcome problems caused by data which is bad from the start. Callibration and other wireline and MWD product quality problems discovered at the wellsite ...
This introductory course is designed for industry professionals with no prior geological training. Registrants will gain an understanding of fundamental geological principles and the tools and techniq ...
The course illustrates that production logging PLT refers to a suite of logs that are normally run on completed injection or production wells to evaluate the performance of the well itself or of the r ...
Providing services with a high quality that are satisfying the requirements
Appling the specifications and legalizations to ensure the quality of service.
Best utilization of resources for continually improving the business activities.
BTS keen to selects highly technical instructors based on professional field experience
Since BTS was established, it considered a training partner for world class oil & gas institution
1st floor, Incubator Buildingو Masdar City, Abu Dhabi, UAE
Sun to Fri 09:00 AM to 06:00 PM
Contact Us anytime!
Request Info