Introduction to Oil Well Service & Workover
Course Description
Well servicing and work over is concerned with maintaining production from wells. Cleanout and work over involves the reconditioning of wells that are no longer producing properly. This introductory training course introduces the subject of these operations. The course gives some basic facts about the petroleum industry in general and well servicing and work over in particular. This course is an introduction for engineers, technologists, service personnel and others involved directly or indirectly with the planning and programming of completion and work over operations. This course provides an overview of key considerations in well completion and work over design, and a fundamental explanation of well/service equipment and operations. Technical explanations of common practices are given, along with troubleshooting hints.
The Training Course Will Highlight ?
Training Objective

By the end of this course delegates will be able:

  • To provide the required comprehensive knowledge and skills for well servicing and work over
  • To select the right means for well intervention
  • To write well servicing or work over programs
  • To supervise well servicing or work over operations

Target Audience

Completion, Well Servicing or Work over Engineers and Supervisors, with client or service companies, familiar with well control operations, Drilling Engineers, Senior Drilling Engineers, Drilling Supervisors, Work over Engineers, Petroleum Engineers, Completion Engineers, Tool Pushers, Reservoir and Senior Reservoir Engineers, Geologists, Production Engineers, Well site Engineers, Foremen, Industry Personnel

Training Methods

This interactive Training will be highly interactive, with opportunities to advance your opinions and ideas and will include;

  • Lectures
  • Workshop & Work Presentation
  • Case Studies and Practical Exercise
  • Videos and General Discussions

Daily Agenda

Reasons and Well Intervention Means on Production Well

  • Intervention means classification
  • Well intervention main reasons
  • Measurement
  • Maintenance
  • Well remedial and work over
  • Main intervention means: wire line, coiled tubing, snubbing, work over rig

Review of Completion, Wellhead & BOP Stack Set Up:

  • Review of completion installation and equipment technology
  • Standard completion
  • Intelligent completion
  • Multi-zone gravel pack completion
  • Deep water completion fitted with sand control equipment
  • Review of wellhead set up
  • Review of BOP stack set up versus company rules

Well Servicing

  • Safety issue during well servicing operations
  • Intervention equipment set up
  • Study of different well servicing cases
  • Standard completion
  • Tubing less completion
  • Intelligent completion
  • Multi zone gravel pack completion
  • Deep water completion fitted with sand control equipment
  • Light intervention case study

Workover:

  • Safety issue during workover operations
  • Main operations
  • Well neutralization and means
  • Xmas-tree removal
  • Workover rig and BOP stack installation
  • Workover operation
  • Fishing operation
  • Operation risk evaluation versus well operation cost and budget
  • Depleted reservoirs
  • Losses and potential reservoir damage
  • Well kick-off after well intervention
  • Study of different well work over cases
  • Standard completion
  • Tubing less completion
  • Smart completion
  • Multi zone gravel pack completion
  • Deep water completion fitted with sand control equipment
  • Work over case study
Accreditation

BTS attendance certificate will be issued to all attendees completing minimum of 80% of the total course duration.

Quick Enquiry

Request Info

Download Brochure Request In house Proposal

Course Rounds : (5 -Days)


Code Date Venue Fees Register
DE100-06 24-06-2024 Paris USD 6950
DE100-07 19-08-2024 London USD 6950
DE100-08 13-10-2024 Dubai USD 5450
Prices doesn't include VAT

UpComing Date


Details
  • Start date 24-06-2024
  • End date 28-06-2024

Venue
  • Country France
  • Venue Paris

Quality Policy

 Providing services with a high quality that are satisfying the requirements
 Appling the specifications and legalizations to ensure the quality of service.
 Best utilization of resources for continually improving the business activities.

Technical Team

BTS keen to selects highly technical instructors based on professional field experience

Strengths and capabilities

Since BTS was established, it considered a training partner for world class oil & gas institution

Search For Available Course

Abu Dhabi, UAE

1st floor, Incubator Buildingو Masdar City, Abu Dhabi, UAE

00971-2-6446633

Sun to Fri 09:00 AM to 06:00 PM

info@btsconsultant.com

Contact Us anytime!