DAY 1
Introduction to Risk Assessment
The Concepts of Hazards, Risk and Risk Assessment
- Methods for Risk Evaluation
- Integrating Risk Assessment within Risk Management
- Risk hierarchy and risk management
- Bow-Tie risk assessment technique and barrier analysis
DAY 2
Hazard and operability study : HAZOP
- What is a HAZOP?
- Six Step Approach.
- Objective of
- How and Why HAZOP is
- Purpose of HAZOP.
- HAZOP – Hazard &
- Documents needed for HAZOP
- HAZOP Study Procedure, with Sample Exercises
- Where and When to Use HAZOP and the Requirements for a Successful HAZOP Study
- Team Composition for HAZOP Studies
- Guide Words and Process variables used for HAZOP Studies
DAY 3
HAZOP Leadership Techniques
- HAZOP Team Leader / Facilitator Requirements
- HAZOP Scribe Requirements
- Facilitating HAZOP Studies - do’s and don’ts
- Information required to allow Successful HAZOP Studies
- Review of Commercial Software used for HAZOP and Management of Change ‘MOC’
DAY 4
Consequence Analysis
- Theory Behind Fire, Explosion and Toxic Dispersion Modelling Utilized in Quantitative Risk Assessments
- Types of Fires and their Effects on People and Equipment
- Types of Explosions and their Effects on People and Equipment
- Review of Software available for Consequence Calculations
DAY 5
The Role of QRA
- Introduction to Quantified Risk Assessment “QRA”
- The Role of Event Tree Analysis in Scenario Development
- The Role of Fault Tree Analysis for Multi-causation Analysis
- Applications for ETA and FTA
- Failure Data for Use in QRA’s
- Societal Risk and Individual Risk
- Review of Software available for Quantitative Risk