Your Growth, Our Mission
Newly-hired Engineers
• Well Intervention Engineers
• Petroleum and Production Engineers
• Production Technology Engineers
• Completion Engineers
• Reservoir Engineers
• Stimulation Engineers
• Drilling Engineers
• Other Company engineers involved in production technology
• Managers and Government Officials and others involved with production technology
• Supervisors, Field Operators and Technicians involved with production technology
The training instructor relies on a highly interactive training method to enhance the learning process.
The course material is rich with various training tools that ensure all participants gain a
complete understanding of all the topics covered. The training environment is highly
stimulating, challenging, and effective for all trainees to participate, share their thoughts, and
inquire about their in-house challenges.
Module One: Introduction to Production Technology
• Reservoir Drive Mechanisms
• Produced Fluids Properties
• Inflow Performance Relationship
• Vertical Lift Performance
• Multiphase Flow and Multiphase Flow Correlations
• System Nodal Analysis
Module Two: Well Physical Components
• Casing, Tubing, and Completion Components
• Wellheads and Xmas Trees
• Barrier Principles and Well Integrity
• Sustain Annulus Pressure and MAASP Calculations
Module Three: Production Technology Jobs
• Perforation Operations
• Production Logging
• Cement and Corrosion Evaluation Logs
• Reservoir Saturation Tool Logging
• Water and Gas Shut-off
• Sand Control Systems
• Well Testing
Module Four: Artificial Lift Methods and Well Stimulation
• Selection of Artificial Lifting Systems
1. Gas Lift Technology
2. Electric Submersible Pump (ESP)
3. Sucker Rod Systems
4. Progressive Cavity Pump
5. Hydraulic Pumping Systems
• Formation Damage
• Stimulation Technologies
Module Five: Well Intervention Jobs and Equipment
• Well Intervention Method
1. Slick Line
2. Electric Line
3. Coiled Tubing
4. Snubbing Applications
• Well Lifting and Sand Clean-out Jobs
• Water Loading Problem Mitigation (Velocity String Applications)
• Flow Assurance Problems
| Code | Date | Venue | Fees | Action |
|---|---|---|---|---|
| DE249-02 |
2026-07-12
|
Dubai
|
USD
5450
|
Register |
| DE249-03 |
2026-09-13
|
Manama
|
USD
5450
|
Register |
| DE249-04 |
2026-11-15
|
Dubai
|
USD
5450
|
Register |
Prices don't include VAT
Your Growth, Our Mission