Rig component
Course Description
The course describes the six major sub-systems of a drilling rig and the function of each system.
The Training Course Will Highlight ?
Training Objective

At the End of the Course Participants will be able to:
Power System:
• Describe the power system on a drilling rig.
Hoisting system:
• Identify the names of each of the component parts of the hoisting system and state
Circulating System:
• Describe the functions of the drilling fluid.
• Rotary System:
• Identify the names of each of the component parts of the rotary system and state
• Describe the procedure for making a connection.
Well Control System:
• Identify the names of each of the component parts of the well control system and state its purpose.
Well Monitoring Equipment:
• List and describe the functions which are monitored and the monitoring equipment that would be placed on the rig.

Target Audience

Drilling Engineers

Drilling Supervisors

Junior Directional Drillers

Senior Well Engineers
• Tool Pushers

Training Methods

Course structure: Lecture (60%), Videos (20%), Case Studies (10%), Discussion (10%)

 

Course assessment:  ـ pre test    ـ Post Test.

Daily Agenda

Day 1

Introduction

Power system
1. Component of power system
2. method of generating the electrical power
3. types of generator

Hoisting System
1. Component of hoisting system
2. Draw works
3. Drilling Lines
4. Crown block
5. Traveling block
6. Dead Line Anchor
7. fast line
8. Drilling line tension
9. Slip and cut operation.
10. Round Trip Operations.
11. Drilling Ahead.
12. Running Casing.
13. Short Trips.
Day 2

Circulating system
1. Introduction.
2. Main components of the circulating system.
3. Drilling fluid (mud)
4. Solids removal equipment.
5. Shale shaker
6. Degasser
7. DE sander
8. Deciliter
9. Centrifuge
10. Mud pits and connections
11. Duplex (2 cylinders) - double acting.
12. Triplex (3 cylinders) - single acting.
Day 3

Rotary System
1. Introduction.
2. Kelly.
3. Kelly saver sub.
4. Kelly cocks
5. Rotary table
6. Master bushing and Kelly bushing.
7. Procedure for Adding Drill pipe when Drilling Ahead
8. Procedure for Pulling the Drill string from the Hole
9. Iron Roughneck

Top Drive Systems
1. Top drive systems installed in the derrick
2. Top drive types
Day 4

WELL CONTROL SYSTEM
1. Rules & Regulations
2. Well Control Equipment
3. Warming Signs of Kicks
4. Well Control Procedures
5. Causes of Kicks
6. Closing in a Well for Well Control
7. Well Control Operations
8. Rig Math for the Man on the Rig
Day 5
1. Unusual Well Control Operations.
2. Shallow Gas Kicks.
3. BOP Diverter & Closing System.
4. Equipment Limitations.
5. No Normal Pressure & Means of detecting.
6. Supervising Well Control Operations.
7. Well control killing procedure and methods.
8. Associated Problems.

WELL MONITORING SYSTEM
1. Mud logging.
2. drilling parameters monitoring

Inspection Main Rig components
1. inspection period for all rig component

Accreditation
Quick Enquiry

Request Info

Download Brochure Request In house Proposal

Course Rounds : (5 -Days)


Code Date Venue Fees Register
DE246-01 12-04-2026 Dubai USD 5450
DE246-02 20-07-2026 Istanbul USD 5950
DE246-03 04-10-2026 Doha USD 5450
DE246-04 20-12-2026 Dubai USD 5450
Prices doesn't include VAT

UpComing Date


Details
  • Start date 12-04-2026
  • End date 16-04-2026

Venue
  • Country UAE
  • Venue Dubai

Quality Policy

 Providing services with a high quality that are satisfying the requirements
 Appling the specifications and legalizations to ensure the quality of service.
 Best utilization of resources for continually improving the business activities.

Technical Team

BTS keen to selects highly technical instructors based on professional field experience

Strengths and capabilities

Since BTS was established, it considered a training partner for world class oil & gas institution

Search For Available Course

Abu Dhabi, UAE

1st floor, Incubator Buildingو Masdar City, Abu Dhabi, UAE

00971-2-6446633

Sun to Fri 09:00 AM to 06:00 PM

info@btsconsultant.com

Contact Us anytime!