Course Details

Your Growth, Our Mission

HV/MV Cable Splicing, Jointing
Course Description
The electricity companies have to supply electricity to the consumers at the lowest possible cost commensurate with safety. Power cables represent a major capital asset for electricity suppliers. While in service power cables must be maintained and monitored in order to anticipate faults and possibly avert any failure. While requirement for underground cables have been increasing, there has been a rapid development of new cable types and accessories including the use of polymeric cables (predominantly XLPE). Evaluating technical and economic aspects of new cable systems is not easy. Furthermore the installation of underground power requires unique skills and knowledge. Tasks involved cover many aspects: laying, jointing, testing and commissioning underground cables, to cable location and fault-finding. Changes in systems also bring additional costs in stores holdings, job instruction preparation and jointer training. Faults in underground cables can occur at any time, and the causes are many and varied. When faults do occur they generally cause loss of supply to customers and loss of revenue for suppliers. So it is imperative that the fault location process is efficient and accurate to minimize excavation time, which results in reducing the inconvenience to all concerned. For fault locating to be efficient and accurate technical staff needs to have expert knowledge accompanied with experience in order to attained service reliability. This course is designed to ensure that those responsible for the selection, laying, operation, maintenance and monitoring of power cables understand the characteristics, technical issues involved and comply with relevant specifications and requirements.

Electrical power engineers and advanced operating staff of substations, factories, electrical distribution networks and transmission.

This interactive Training will be highly interactive, with opportunities to advance your opinions and ideas and will include;

  • Lectures
  • Workshop & Work Presentation
  • Case Studies and Practical Exercise
  • Videos and General Discussions

Day 1

  • Identify the various types of cables, connectors, materials and methods of connection.
  • Describe the construction of cables, classification, conductors materials and configurations, the different applications and voltage of cables
  • Apply the latest techniques in HV/MV cable splicing jointing, terminating and testing
  • Apply the theory of joints and terminations
  • Underground cable ampacity
  • Cables installed in ducts
  • Short circuit

 

Day 2

  • Practice cable jointing, splicing, testing and terminating
  • Raisons for cable failures, analysis and predictive maintenance
  • Method of repairing the damaged cable outer sheath up to 220 kV for XLPE & Oil filled cables.
  • Method of repairing the silicone oil leak of XLPE cable sealing ends up to 132 kV.
  • Short circuit effect on cables
  • Thermal stress
  • Electromechanical stress
  • Permitted voltage drop

 

Day 3

  • Electrical & hydraulic tests of XLPE & Oil filled cables.
  • Visual inspection of the cable sealing ends, stop joints & transmission joints.
  • Gauge reading of Oil filled & XLPE cable Terminations.
  • Electrical High voltage cable cleaning
  • High voltage cable inspection
  • Joints over 30 kV
  • Open terminations
  • Resistive stress control
  • Cable termination design
  • Enclosed terminations
  • Crimp connection
  • Pulling the cable
  • Installing cable racks
  • Cable jacket and sheath removal
  • Cable metallic shielding removal
  • Cable semi-conducting material removal
  • Cable insulation removal
  • Cable splice connector
  • Installing taped cable insulation
  • Identification of conductors
  • Conduits
  • Cable supports
  • Trunking
  • Cable tray
  • Trenches
  • Service entrance

 

Day 4

  • High voltage cable maintenance
  • High voltage cable termination
  • Steps for fault location
  • Fault location methods
  • A-frame
  • Time domain reflectometry
  • Wheatstone (resistance) bridge

 

Day 5

  • Able to read and understand description , legend and trace site routs, cable burying details
  • Method of Repairing the oil leak of Oil filled cable circuits up to 132 kV.
  • Manner of Boosting the oil pressure of oil filled cable circuits.

BTS attendance certificate will be issued to all attendees completing a minimum of 80% of the total course duration.

Request Info

Course Rounds

5 Days
Code Date Venue Fees Action
EE204-01
2026-03-30
Istanbul
USD 5950
Register
EE204-02
2026-07-06
Dubai
USD 5450
Register
EE204-03
2026-08-30
Cairo
USD 5450
Register
EE204-04
2026-12-27
Dubai
USD 5450
Register

Prices don't include VAT

Related Courses

Your Growth, Our Mission

Contact Us

Contact us to meet all your inquiries and needs, as our professional team is pleased to provide immediate support and advice to ensure you achieve your goals and facilitate your experience with us in the best possible way.

UAE
1st floor, Incubator Building, Masdar City, Abu Dhabi, UAE
Office
00971-2-6446633
Mobile
00971-50-5419377
E-mail
info@btsconsultant.com
Working Hours
Sun to Fri 09:00 AM to 06:00 PM