Your Growth, Our Mission
Operation Personnel, Safety Officers, Control Engineers, Production Supervisors, Plant Operators, Instrument / Electrical / Mechanical Supervisors & Technicians Process & Procedures Engineers (Offshore).
This interactive Training will be highly interactive, with opportunities to advance your opinions and ideas and will include;
Test Separators, Process Separators, Desalting Facility, Crude Oil Coolers, Field Metering, Produced Brine Treatment System, Crude Oil Storage and Shipping Terminal, Crude Oil Deliver Station and Vapor Recovery Unit
Principles of Separation, Phases of Separation, Stages of Separation Separators Classification, Separator Internals, Separators Operation& Troubleshooting, and Troubleshooting procedure for liquid carries over in outlet gas stream
Emulsion, Emulsifying Agents, Demulsifies, Factors Affecting Emulsion Breakdown, Crude Oil Treating (Emulsion Treating), Factors that Affect Treating, Equipment Used in Oil/Water Separation and Crude Oil Desalting.
Chemical Treating, Heaters, Electrostatic, Electrostatic Treater Operation
The desalting facility is made up of the following:
Desalting water supply pumps, Dilution water filters, Oxygen stripping tower. Water storage vessel Dilution water recycle pumps, Free water knockout separators (FWKO) , Crude Desolater operations and troubleshooting, High salt content in desalted crude, Water content of desalted crude too high and Appreciable continuous variations in voltmeter
Water Hydrocarbon System Behavior, Gas Dehydration Systems
Absorption Using Liquid Desiccants (Glycol Dehydration), Process Flow and Components
Process Operation, Process Variables, Operating Problems,
Troubleshooting
Impurities in Water, Operating Problems, Industrial Water Treatment, Waste Water Treatment and Water Injection
Principles of Heat Transfer, Function of Heat Transfer Equipment, Types of Heat Exchangers, Heat Exchangers Operation and Troubleshooting and Cleaning of Heat Exchangers
Principles of Heat Transfer in Fired Heater, Performance Monitoring
Fired Heater Operation and Troubleshooting
Basic Pump Hydraulics, Centrifugal Pumps, Centrifugal Pump Operation, Start-up and Shutdown Procedure and Troubleshooting
Positive Displacement Pump, Reciprocating Pumps Types, Reciprocating Pumps Operation, Reciprocating Pumps Operating Problems, Reciprocating Pumps Troubleshooting
The Fixed Roof Tanks, The Floating Roof Tanks, Hazardous Conditions Explosive Air – Vapor Mixtures, Ignition Sources, Static Electricity, Pyrophoric Iron Sulphide , Spark Formation by Striking of Metal Objects, Electrical Equipment ,Smoking in the Tank ,Gases Discharged During Gas – Freeing, Petroleum Gases, Hydrogen Sulphide, Gas and Safety procedures
BTS attendance certificate will be issued to all attendees completing minimum of 80% of the total course duration.
| Code | Date | Venue | Fees | Action |
|---|---|---|---|---|
| PE180-01 |
2026-04-12
|
Cairo
|
USD
5450
|
Register |
| PE180-02 |
2026-07-19
|
Manama
|
USD
5450
|
Register |
| PE180-03 |
2026-10-12
|
Kuala-Lumpur
|
USD
5950
|
Register |
| PE180-04 |
2026-12-20
|
Dubai
|
USD
5450
|
Register |
Prices don't include VAT
Your Growth, Our Mission