Day 1
Pre-exam and course opening
PART 1 – INTRODUCTION
- Scope
- Organization and Use
- Responsibilities
- Owner-User
- Inspector
- Engineer
- Qualifications
- Education and Experience
- Owner-User
- Inspector
- Engineer
- Definition of Terms
PART 2 - FITNESS-FOR-SERVICE ENGINEERING ASSESSMENT PROCEDURE
- 1 General
- 2 Applicability and Limitations of the FFS Assessment Procedures
- 3 Data Requirements
- 3.1 Original Equipment Design Data
- 3.2 Maintenance and Operational History
- 3.3 Required Data/Measurements for a FFS Assessment
- 3.4 Recommendations for Inspection Technique and Sizing Requirements
- 4 Assessment Techniques and Acceptance Criteria
- 5 Remaining Life Assessment
- 6 Remediation
- 7 In-Service Monitoring
- 8 Documentation
DAY 2
PART 3 - ASSESSMENT OF EXISTING EQUIPMENT FOR BRITTLE FRACTURE
- 1 General
- 2 Applicability and Limitations of the Procedure
- 3 Data Requirements
- 3.1 Original Equipment Design Data
- 3.2 Maintenance and Operational History
- 3.3 Required Data/Measurements for a FFS Assessment
- 3.4 Recommendations for Inspection Technique and Sizing Requirements
- 4 Assessment Techniques and Acceptance Criteria
- 4.1 Overview
- 4.2 Level 1 Assessment
- 4.3 Level 2 Assessment
- 4.4 Level 3 Assessment
- 5 Remaining Life Assessment – Acceptability for Continued Service
- 6 Remediation
- In-Service Monitoring
- Documentation
Day 3
PART 4 - ASSESSMENT OF GENERAL METAL LOSS
- 1 General
- 2 Applicability and Limitations of the Procedure
- 3 Data Requirements
- 3.1 Original Equipment Design Data
- 3.2 Maintenance and Operational History
- 3.3 Required Data/Measurements For A FFS Assessment
- 3.4 Recommendations for Inspection Technique and Sizing Requirements
- 4 Assessment Techniques and Acceptance Criteria
- 4.1 Overview
- 4.2 Level 1 Assessment
- 4.3 Level 2 Assessment
- 4.4 Level 3 Assessment
- 5 Remaining Life Assessment
- 5.1 Thickness Approach
- 5.2 MAWP Approach
- 6 Remediation
- 7 In–Service Monitoring
- 8 Documentation
Day 4
PART 5 – ASSESSMENT OF LOCAL METAL LOSS
- 1 General
- 2 Applicability and Limitations of the Procedure
- 3 Data Requirements
- 3.1 Original Equipment Design Data
- 3.2 Maintenance and Operational History
- 3.3 Required Data/Measurements for a FFS Assessment
- 3.4 Recommendations for Inspection Technique and Sizing Requirements
- 4 Assessment Techniques and Acceptance Criteria
- 4.1 Overview
- 4.2 Level 1 Assessment
- 4.3 Level 2 Assessment
- 4.4 Level 3 Assessment
- 5 Remaining Life Assessment
- 5.1 Thickness Approach
- 5.2 MAWP Approach
- 6 Remediation
- 7 In-Service monitoring
- 8 Documentation
Day 5
PART 6 - ASSESSMENT OF PITTING CORROSION
- 1 General
- 2 Applicability and Limitations of the Procedure
- 3 Data Requirements
- 3.1 Original Equipment Design Data
- 3.2 Maintenance and Operational History
- 3.3 Required Data/Measurements for a FFS Assessment
- 3.4 Recommendation for Inspection Technique and Sizing Requirements
- 4 Assessment Techniques and Acceptance Criteria
- 4.1 Overview
- 4.2 Level 1 Assessment
- 4.3 Level 2 Assessment
- 4.4 Level 3 Assessment
- 5 Remaining Life Assessment
- 6 Remediation
- 7 In Service Monitoring
- 8 Documentation
- Introduction for other defects assessment