Combined Cycle Gas Turbine’s Performance
Course Description
The addition of gas turbine-based combined cycle power plants to supply new generating capacity continues to play a major role in the power industry. This technology is being adopted by all key players in the power industry because it offers high thermal efficiency, low emissions, low installed cost, flexibility in fuel selection, low operation and maintenance cost, short installation time, and high operating flexibility. A successful approach to providing technical services and engineering support is to address the operational and maintenance aspects involving the integrated functioning of the two thermodynamic cycles in a combined cycle power plant. The staff must understand the interrelationships between the combined cycle plant components and systems to efficiently operate the plant.
The Training Course Will Highlight ?

The candidates will be able to explain the effect of operating parameters such as firing temperatures, compressor pressure ratios, ambient temperature and pressure conditions, turbine exhaust temperatures and their effect on gas turbine efficiency/power output, and the combined cycle efficiency/power output. This course goes through the overview of a combined cycle gas turbine; this will be followed by the different types of Gas Turbine. This is then expanded on to give a detailed understanding of the performance and management of the operations of a combined cycle gas turbine.

Training Objective

By the end of this course delegates will be able to:

  • Obtain an understanding of the performance of a Combined Cycle Gas Turbine
  • Identify the different types of Combined Cycle Gas Turbine, Gas Turbine Performance and Power Plant Operation

Target Audience

Electrical Engineers, Power Generation Engineers, Power System Protection Engineers, Gas turbine newcomers and more experienced persons who desire an overview of the many available gas turbine technologies, Process Control Engineers & Personnel, Electrical and Instrumentation Technicians & Design Engineers, Maintenance Technicians & Supervisors, Plant Operators & Technicians, Oil & Gas Industry Personnel

Training Methods

This interactive Training will be highly interactive, with opportunities to advance your opinions and ideas and will include;

  • Lectures
  • Workshop & Work Presentation
  • Case Studies and Practical Exercise
  • Videos and General Discussions

Daily Agenda

Combined Cycle GT Plant Overview

  • Gas Turbine ( Frame 9e, 13E2)
  • Steam Turbine
  • Boiler Components

 

Performance Theory

  • Brayton Cycle
  • Rankine Cycle
  • Combined Cycle

 

Performance Terms and Definitions

  • Units and Terminology, Conversion factors
  • Power Output (Gross and Net)
  • Heat Rate (Gross and Net)
  • Energy inputs
  • Efficiency
  • System Losses

 

Correction Factors

  • Test Reference conditions
  • Pressure
  • Temperature
  • Humidity
  • Power factor
  • Altitude
  • Pressure Drops
  • Boiler steam flow
  • Condenser vacuum
  • Frequency

 

Gas Turbine Performance

  • Test Procedure
  • Instrumentation Required
  • Performance Data Collection
  • Performance Calculations
  • Using Correction Factors

 

Steam Turbine & Boiler Performance

  • Test Procedure
  • Instrumentation Required
  • Performance Calculations
  • Supplementary Firing Considerations

 

CCGT Plant Performance

  • Test Procedure
  • Instrumentation Required
  • Performance Data Collection
  • Performance Calculations
  • Overall Plant Efficiency
  • Practical Examples of Performance Calculations

 

Performance Diagnostics

  • Identifying lost performance
  • Locating the cause
  • Remedial action

 

Performance Improvement Methods

  • Increase Mass Flow (steam, water injection)
  • Chillers
  • Increase Firing Temperature (Component Upgrade Options)
  • Reducing Leakage and Improving Cooling
Accreditation

BTS attendance certificate will be issued to all attendees completing a minimum of 80% of the total course duration.

Quick Enquiry

Request Info

Download Brochure Request In house Proposal

Course Rounds : (5 -Days)


Code Date Venue Fees Register
EE150-05 08-12-2024 Manama USD 5450
EE150-01 22-06-2025 Doha USD 5450
EE150-02 24-08-2025 Dubai USD 5450
EE150-03 05-10-2025 Manama USD 5450
EE150-04 07-12-2025 Dubai USD 5450
Prices doesn't include VAT

UpComing Date


Details
  • Start date 08-12-2024
  • End date 12-12-2024

Venue
  • Country Bahrain
  • Venue Manama

Quality Policy

 Providing services with a high quality that are satisfying the requirements
 Appling the specifications and legalizations to ensure the quality of service.
 Best utilization of resources for continually improving the business activities.

Technical Team

BTS keen to selects highly technical instructors based on professional field experience

Strengths and capabilities

Since BTS was established, it considered a training partner for world class oil & gas institution

Search For Available Course

Abu Dhabi, UAE

1st floor, Incubator Buildingو Masdar City, Abu Dhabi, UAE

00971-2-6446633

Sun to Fri 09:00 AM to 06:00 PM

info@btsconsultant.com

Contact Us anytime!